Build, control and file battery passports for the EU market.

Reg (EU) 2023/1542. Annex XIII. Article 40 representative mandates. Article 77(4) registry submission. ESPR product groups as their delegated acts land.

For importers, authorised representatives and manufacturers placing batteries on the EU market. A DPP service provider under ESPR Art 2(32): we validate against the current schema, file on your authorised instruction, and hold the evidence for ten years.

Container terminal at night
Rows of industrial battery cells
Built to the live regulatory surfaceAnnex XIII, currentEU DPP RegistryImmutable evidence, ten-year retentionEU / UK residency

Three ways in

Pick the door that matches where you are.

Every route puts your passport data in the same custody store. The difference is how much of the work you keep.

01 · Any operator, in the Union or outside it

Hold the copy

You already run your own passport system. We hold the independent, encrypted copy of every record that an economic operator is expected to keep separately from the primary instance, and restore it on request. A copy you keep yourself is not independent. The obligation is met by a separate provider holding it.

Backup hosting →

02 · Manufacturers outside the Union

Be represented

We hold the Article 40 mandate, keep the file, answer the authorities, and register the passports under the same relationship.

Authorised representative →

03 · Anyone who has to file

Have it run for you

Send us the records in whatever shape they are in, new or already issued. We build the Annex XIII passports, validate them, submit them to the EU registry and report status back, through a portal you check rather than a tool you learn.

How the service works →

How it works

One regulated path from your systems to the registry.

For operators who file through us, doors two and three. The economic operator placing a product on the EU market carries the legal responsibility. We process passport data on your authorised instruction, and keep the evidence that proves it was done right.

Connect your data

Pull passport data from MES, ERP, PLM or QMS over SFTP, REST or webhook, or have suppliers submit through a managed portal.

Check against Annex XIII

Every field is validated against the current delegated-act schema, and a per-passport readiness check names exactly what is still missing before anything is filed.

File to the registry, keep the evidence

We submit on your authorised instruction and log every attempt to an immutable, time-stamped audit record. The EU DPP Registry became operational on 20 July 2026, but battery registration is not open to any operator pending the Commission’s battery semantic catalogue. Once it opens and our onboarding completes, every active passport is resubmitted so each carries a real registry reference.

Inside the platform

The work before the filing, done inside the platform.

The registry filing is the last step. Before it comes the work, building the passport, controlling access, moving the data, and that is what the platform is for.

Build

A guided wizard for the full Annex XIII field set

Over 100 fields per battery category, identity, materials, carbon footprint, circularity, with the mandatory set enforced per category (EV, Industrial, LMT) and passports at Model, Batch or Item level.

Control

Four access tiers, built in

Public QR scan, authority access, 48-hour legitimate-interest tokens for recyclers and second-life operators, declared, logged and auditable, and your own full dashboard. Confidential fields stay confidential.

Deliver

Data in, data out, on your terms

Import CSV, JSON, JSON-LD or XML with row-level validation diagnostics. Deliver to your systems by SFTP, FTP or signed webhook in seven formats, or work directly against the REST API.

Prove

Evidence on demand

Every passport carries its audit trail: daily encrypted backups, ten-year retention, exportable access logs and a per-activation billing reference. When an authority asks, the answer is one export away.

Represent several manufacturers? Every client gets their own workspace, delegated logins and per-client billing, under your brand.

The console for authorised representatives

The operator console

Every passport, every submission, every piece of evidence, in one place.

Track each product’s passport from draft to filed, see exactly which activations are billable, and pull audit evidence on demand when a market-surveillance authority asks.

  • Live submission state for every passport: draft, validated, filed, or returned with the failing clause.
  • Metered activation you can reconcile: each billable event maps to a registry submission.
  • One-click audit evidence: time-stamped proof of what was filed, when, and on whose instruction.
PassportsBattery · 2026DraftAllFiled
Filed, year to date1,284
Validation pass99.2%
Pending18
PassportProductState
DEMO-PP-2026-EV104Module 48V 5.2kWhFiled
DEMO-PP-2026-EV105Module 48V 5.2kWhFiled
DEMO-PP-2026-IN031Industrial 215kWhValidating
DEMO-PP-2026-LM012LMT pack 1.1kWhValidating
Digital Product PassportRegistered
CHEMISTRYLFP
CAPACITY5.2 kWh
CARBON FOOTPRINT61.4 kg CO₂e/kWh
RECYCLED CONTENT16%
SUPPLY-CHAIN ACTORS7 declared
STATE OF HEALTH100% · new
Preview, not yet submitted to the EU DPP Registry

The public passport

What a customs officer, recycler or buyer sees on scan.

Every filed passport resolves to a clean, official record built straight from the Annex XIII data, readable on any device, no app, no account. This is the regulation-facing surface, and it is designed to look like the credential it is.

  • Resolvable identifier: GS1 Digital Link from the product’s data carrier.
  • Registry-verified: the page shows the live EU DPP Registry registration state, not a marketing claim.
View the live passport

Registry readiness

Ready for the registry, and for the day it goes live.

The EU DPP Registry became operational on 20 July 2026, but no operator can register a battery passport yet: the Commission has not defined the battery semantic catalogue, and battery registration stays closed to everyone until it does. We run in mock mode until it opens and our onboarding completes. The platform is built for the switch.

What is still missing, named

Each passport is checked against the registration requirements, Operator ID, an active public passport, a resolvable GS1 Digital Link and the mandatory Annex XIII fields, and every gap is spelled out in plain language, so you fix it before you file.

An auditable submission log

Every submission attempt is recorded: the schema version, a content hash of the payload, the registry’s response and the outcome. When an authority asks what you filed and when, the answer is one export away.

Automatic resubmission at go-live

While we run in mock mode, filings carry a placeholder reference. Once onboarding is complete and conformance verified, every active passport is resubmitted to carry a real one, oldest first, once each, never double-filed.

About the EU registry

Trust and security

Audit-grade by construction.

This is regulated infrastructure. Residency, immutability and access are not features bolted on, they are how the system is built.

EU / UK residency

Passport data and evidence are stored and processed in EU and UK regions only. No transfer outside without instruction.

Immutable evidence

Every submission writes a time-stamped, append-only record: what was filed, when, and on whose authorised instruction.

Full-period retention

Records are held for the retention period the regulation mandates, available for surveillance authorities on request.

Scoped access

Role-scoped operator accounts, supplier-portal isolation, and a procurement pack for your security review.

Read the full trust surface

Request access

Be ready before the deadline, not after it.

Access is granted per organisation to economic operators under the EU Battery Regulation. A relationship manager reviews each request and replies by email.